Trusted Safety Solutions Across the Entire Energy Sector
For over 40 years, Rapp Bomek has delivered high-performance safety solutions across the energy sector ā from traditional oil and gas facilities to emerging renewable energy industries.
Operating in harsh offshore and onshore environments requires robust design, reliable performance and deep industry understanding. This is where Rapp Bomekās expertise in advanced doors, hatches, gates and control systems has been built and refined.
Hinged doors
Rapp Bomekās hinged doors for energy applications are available in multiple steel grades (AISI 304, 316 or carbon steel) and can be supplied with bespoke locking, panic devices and optimized finishes. All doors are engineered to meet applicable fire and safety standards, and can be delivered with EX/ATEX certification where required.
Sliding doors
Our sliding doors are engineered for both external and internal environments, including platforms and FPSOs. Available with EX/ATEX approval, they can be configured for designated heeling requirements and operated manually or via pneumatic/electric systems tailored to your installation.
In need of service or parts?
Contact our service and parts team for help.
A few previous projects
West white rose
Newfoundland Canada
The White Rose field and satellite extensions are located in the Jeanne dāArc Basin, 350 km east of Newfoundland and Labrador in approximately 120 m of water. The West White Rose Project will access further resources to the west of the field. The first oil production is anticipated 2024 and is expected to reach a peak production of 75,000 barrels per day. Rapp Bomek delivered over 90 fire rated doors to the West White rose project. The delivery consists of both hinged and sliding doors ā part of them equipped with pneumatic operation system.
Mariner Field
United Kingdom North Sea
The Mariner Field is located on the East Shetland Platform of the UK North Sea, approximately 150 kilometers east of the Shetland Isles. The Mariner oil field consists of two shallow reservoir sections ā the deeper, Maureen Formation at 1492 meters and the shallower Heimdal reservoir at 1227 meters. Rapp Bomek delivered 110 fire doors to the Mariner project.
Troll B
North Sea Norway
Troll B, isa floating process and accommodation platform with concrete hull. The thin oil layer is between 22 and 26 meters in the Troll West oil province and 11 and 13 meters in the Troll West gas province. In order to recover oil from the thin layer, it has been necessary to develop advanced drilling and production technology. Rapp Bomek delivered fire rated and hinged and sliding doors to the project.
Contact our Energy team
Steinar Nordheim
Sales Manager
Tel: +47 913 63 095
sn@rappbomek.com
Jiaping Wu
Sales Manager
Tel: +47 480 70 234
jiawu@rappbomek.com

